Installation of 12m retaining wall

Plant Utilised:

Leader rig and hydropress

Weather Oaks Housing

The Challenge from the Client

Install a short length of retaining wall adjacent to an existing property to allow construction of footings to a new property. The new footings were to extend below those of the existing property, making the provision of a retaining wall prior to excavation a necessity.

The Ivor King Solution