Cotton Valley

Request Callback

If you'd like some more information or would like to discuss a project, just send us a few details and we'll get back to you for a chat.

Client:
Anglian Water
Location:
Milton Keynes, United Kingdom
Sector:
Water Treatment & Waste
Project Cost:
51k - £250k
Completion Date:
February 2016
Project Period:
10 days
Summary:

Installation of 72nr PU28-1 sheet piles at 10m long to form a cofferdam.

Plant Utilised:

Leader rig, crawler crane

Cotton Valley

The Challenge from the Client:

Install a sheet piled cofferdam inside the existing Sewage Treatment Works to enable construction of a new cake reception facility for Anglian Water.

The Ivor King Solution:

Utilising a Leader Rig fitted with vibro hammer and using pre-augering to condition the soil, the sheet piles were installed with minimum vibration within the boundary of the existing STW. No disruption or damage was caused to the existing treatment works infrastructure.