Clients

 
 

Clients Include:
design images installation


Case Study

Project: British Waterways Board
Contractor: Galliford
Site: Knypersley Reservoir, Stoke on Trent
Equipment: 2 Cranes, an Excavator, a Vibro, Pontoons and a Tug Boat.

The job was to create a solution to enable access to a blocked reservoir outfall.

The installation point was not accessible by land so we:

  • Formed a landing stage for access to the reservoir.
  • Crossed 500m across the reservoir using pontoons and a tug boat.
  • Formed a cofferdam around the blocked outfall to enable access for repair, maintenance and clearance of the culvert in 8 metres depth of water. (pictures below)

Please scroll down to see the various stages of this project.

Crossing the lake using Pontoons and Tug boats: Landing on left.
the landing and crossing the lake

 

Forming the Cofferdam:
cofferdam installation

 

Completing the Cofferdam: creating a cofferdam

 

Completed Cofferdam pumped out after framing: riverside installation